Plumbing, Drain-laying and Gas-fitting | Level 3 | 2022
Whakahuahua Kaupapa
-
-
Download this document and save it to your One Drive.
Edit the document over the project duration by filling in the spaces provided.
Upload your evidence to this submission box.
-
Make a submission Receive a grade
- Describe and Install a hot and cold water reticulation system.
You are required to add evidence of your work for these projects to a Word Document Template. This document tells you what and where to add your evidence.
The Tutor will give you a grade out of 100.