Plumbing, Drain-laying and Gas-fitting | Level 3 | 2022
مخطط الموضوع
-
Low Pressure Hot Water Cylinder Project
Module Objective 4: Install and commission a low pressure, tank fed hot water cylinder
In this project you will:
- Investigate the types of hot water supply systems
- Investigate related legislative requirements
- Recognise and name the components and fixtures related to a low pressure storage system
- Produce an accurate installation diagram
- Create an instructional job card
- Prepare pipework for installation
- Install under supervision a low pressure system
-
قضاء ما لا يقل عن 5 دقائق في هذا النشاط متابعة النشاط حتى النهاية
Complete this lesson as part of your assessment.